You are on page 1of 48

A

PRESENTATION
ON

BY RAMESH KUMAR BETHA SREEKANTH BAMMIDI


1

GENERATOR 413 MVA, 20KV

ET 3.6MVA 20/0.9KV

UAT-B 22MVA 20/6.9KV

G C B

UAT-A 22MVA 20/6.9KV

ST-B 33MVA 20/6.9KV

GT 430MVA 20/400KV

SWITCHYARD SWITCH YARD

UAT-A
6.6KV LOADS TRANFORMER LOADS

UAT-B
TRANFORMER LOADS 6.6KV LOADS

LV TRAFO-A VENTILATION TRAFO ESP TRAFO-A IDCT TRAFO-A

LV TRAFO-B LIGHTING TRAFO ESP TRAFO-B IDCT TRAFO-B

ST-1&3
6.6KV LOADS TRANFORMER LOADS

ST-2&4
TRANFORMER LOADS 6.6KV LOADS

CHP-A(1)&B(3) SILO-A(1)&B(3) WATER SUPPLY-A(1)&B(3) STATION MAINTENANCE-A(1)&B(3) 1&2COMMON-A(1) 3&4COMMON-A(3)

CHEMICAL WATER-A(2)&B(4) RAIN WATER-A(2)&B(4) 1&2COMMON-B(2) 3&4COMMON-B(4)

TIE LINES OF 6.6KV SECTION

ST-A

ST-B

U1-A U2-A

U1-B U2-B

TIE LINES OF PCC SECTION


UAT-A

ESP-A

IDCT-A

LV-A

U-1VEN

LOADS

LOADS

LOADS

U-2 VEN

LOADS

UAT-B

ESP-B

IDCT-B

LV-B

LIGHTING

LOADS

LOADS

LOADS

stat maint

LOADS

6.6/ 0.415KV TRF PCC BUS BAR

PCC LOADS

MCC A BUS BAR MCC LOADS

MCC B BUS BAR MCC LOADS

SNO.

Description 415 V UNIT Aux.Section in MPB(LOC: 6.3 M TG building) PCC#A (2500KVA dry type transformer 6.6 KV/0.433 KV)

Rating

1 2 3 4 5 6 7 8 9 10 11 12 13

Emergency MCC power#A Sealing air Fan#A Vacuum pump#A UPS #1 power supply Condensate water Transportation pump#A BA slurry pump#A Turbine MCC#A Boiler MCC#A Chemical MCC#A Boiler Motor Drive valve power supply panel In-line pump#A Power for lighting & maintenance of switch cabinet#A Switch cabinet Power#A 185 Kw 110 Kw 240 KVA 90 KW 110 Kw 255KW 329KW 52Kw 70Kw 75 Kw 20 Kw 10Kw

SNO.

Description 415 V UNIT Aux.Section in MPB(LOC: 6.3 M TG building)

Rating

1 2 3 4 5 6 7 8 9 10 11 12 13 14

PCC#B (2500KVA dry type transformer 6.6 KV+/- 2*2.5 %/0.433 KV) Emergency MCC power#B Sealing air Fan#B 185 Kw Vaccum pump#B 110 Kw UPS#1 power supply 240 KVA Condensate water Transportation pump#B 90 KW BA slurry pump#B Turbine MCC#B Boiler MCC#B Chemical MCC#B Turbine Motor Drive valve power supply panel In-line pump#B Power for lighting & maintenance of switch cabinet#B Waste water Transfer pump Switch cabinet Power#B 110 Kw 188Kw 379Kw 142Kw 70Kw 75 Kw 20 Kw 75 Kw 10Kw

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

415 V UNIT Aux.Section in MPB(LOC: 6.3 M TG building) PCC#A (2500KVA dry type transformer 6.6 KV+/-2*2.5 %/0.433 KV) #1evaporative cooling unit A #1evaporative cooling unit pump A #1evaporative cooling unit C #1evaporative cooling unit pump C #2evaporative cooling unit C #2evaporative cooling unit pump C #1turbine room roof fan A 18.7m air condtioning room axial fan A 18.7m air condtioning room axial fan B 6.3 m air condtioning room axial fan A 6.3 m air conditioning room axial fan B #2evaporative cooling unit A #1 unit 6.6kv electric distrubution board room axial fan A #1 unit 6.6kv electric distrubution board room axial fan C #2 unit 6.6kv electric distrubution board room axial fan A #1 turbine room roof fan B #1 unit 6.6kv electric distribution board room fan coil unitA #1 excitation room axial fan #2 turbine electric room water cooled thermostatic and humid static air conditioner #1~2control building air cooled packeged air conditioner A #2unit 6.6kv electric distrubution board room axial fan C #1~2chilled water pump

kw 4 4 4 4 4 4 11 0.75 0.75 0.12 0.12 0.75 0.75 11 0.12 11 0.12 0.12 22 0.37 22

Lighting PCC (2*500KVA dry type transformer 6.6 KV+/-2*2.5 %/0.433 KV) (LOC: 6.3 M TG building) 1 2 3 4 5 6 7 8 9 CPP#B Network Control Building MCC#A Power for lighting & maintenance of switch cabinet#B Conveyor Belt #10 Electric Hot Water Tank#A Electric Hot Water Tank#B Electric Hot Water Tank#C Electric Hot Water Tank#D Switch Cabinet Power#A 20 Kw 185 Kw 40 Kw 40 Kw 40 Kw 40 Kw 10 Kw 168Kw

415V ESP PCC 415V ESP PCC#A(2000 KVA, 6.6 KV +/- 2*2.5 %/0.433 KV) 1 Power Supply Air Compressor Building MCC #A 2 Ash hopper fluidizing Hopper Heater #A(E) 3 Auxiliary Bus Bar for unit ESP PCC #B 4 HV Control Cabinet #1 of A Row 5 HV Control Cabinet #2 of A Row 6 HV Control Cabinet #3 of A Row 7 HV Control Cabinet #4 of A Row 8 HV Control Cabinet #5 of A Row 9 HV Control Cabinet #6 of A Row 10 Heater Control Cabinet A Row Left Room 11 Heater Control Cabinet A Row Right Room 12 Rapping Control Cabinet A Row 13 LV Control Cabinet of A Row SACK AREAR 14 PLC Control cabinet 179Kw

415V ESP PCC#B(2000 KVA, 6.6 KV +/- 2*2.5 %/0.433 KV) 1 2 3 4 5 6 7 8 9 10 11 12 13 Ash hopper fluidizing Hopper Heater #B(F) Auxillary Bus Bar for unit ESP PCC #A HV Control Cabinet #1 of B Row HV Control Cabinet #2 of B Row HV Control Cabinet #3 of B Row HV Control Cabinet #4 of B Row HV Control Cabinet #5 of B Row HV Control Cabinet #6 of B Row Heater Control Cabinet B Row Left Room Heater Control Cabinet B Row Right Room Rapping Control Cabinet B Row LV Control Cabinet of B Row SACK AREAR PLC Control cabinet

415V IDCT AREA PCC 415V IDCT AREA PCC#A(2500 KVA, 6.6 KV +/- 2*2.5 %/0.433 KV) 1 Unit#1 mechanical draft Cooling Tower #A 2 Unit#1 mechanical draft Cooling Tower #B 3 Unit#1 mechanical draft Cooling Tower #C 4 Unit#1 mechanical draft Cooling Tower #D 5 Unit#1 mechanical draft Cooling Tower #E 6 Unit#1 mechanical draft Cooling Tower #F 7 Circulating Water Pump House-1 MCC#A 8 Power Supply for Circulating Water Chlorination equipment 9 Unit-1 Switch gear Room Air-cooled split Air conditioner#A 10 Unit-1 Cooling Tower Crane#A 11 Unit-1 Switchgear room Lighting Box#A 12 Unit-1Cooling Tower Lighting Box#A 9 Kw 7.5 Kw 195 Kw 195 Kw 195 Kw 195 Kw 195 Kw 195 Kw

415V IDCT AREA PCC#B(2500 KVA, 6.6 KV +/-2* 2.5 %/0.433 KV) 1 2 3 4 5 6 7 8 9 10 11 12 Unit#1 mechanical draft Cooling Tower #G Unit#1 mechanical draft Cooling Tower #H Unit#1 mechanical draft Cooling Tower #J Unit#1 mechanical draft Cooling Tower #K Unit#1 mechanical draft Cooling Tower #L Unit#1 mechanical draft Cooling Tower #M Unit-1 Cooling Tower maintainance box Power Supply for Circulating Water Chlorination equipment Unit-1 Switch gear Room Air-cooled split Air conditioner#B Unit-1 Cooling Tower Crane#B Unit-1 Switchgear room Axial Fan Unit-1Cooling Tower Lighting Box#B 9 Kw 7.5 Kw 037 Kw 195 Kw 195 Kw 195 Kw 195 Kw 195 Kw 195 Kw

415 V Coal Handling Plant PCC 415V Coal Handlin Plant PCC#A(1600 KVA, 6.6 KV +/- 2*2.5 %/0.433 KV) 1 2 3 4 5 6 7 8 9 10 NO.3 transfer Tower MCC #A NO.4 transfer Tower MCC #A NO.5 transfer Tower MCC #A Conveyor C4 Crusher House MCC #A NO.6 transfer Tower MCC #A CHP Complex Building MCC #A Head Motor of Conveyor #C5 Tail Motor of Conveyor #C5 Control Chest of Coal Waste Water Treatment House 144Kw 95Kw 126Kw 185 Kw 269Kw 163Kw 82Kw 185 Kw 185 Kw 90 Kw

415V Coal Handlin Plant PCC#B(1600 KVA, 6.6 KV +/-2* 2.5 %/0.433 KV) 1 2 3 4 5 6 7 8 9 NO.3 transfer Tower MCC #B NO.4 transfer Tower MCC #B NO.5 transfer Tower MCC #B Conveyor C4 Crusher House MCC #B NO.6 transfer Tower MCC #B CHP Complex Building MCC #B Head Motor of Conveyor #C7A Tail Motor of Conveyor #C7 145Kw 158Kw 162Kw 185 Kw 257Kw 165Kw 70Kw 185 Kw 185 Kw

415 V SILO PCC 415V SILO PCC#A(2000 KVA, 6.6 KV +/- 2*2.5 %/0.433 KV) 1 2 3 4 5 6 7 8 9 10 Power Supply for SILO MCC #A Power Supply for HCSD MCC #A HCSD Pump House Area Mixing tank #A HCSD Pump House Area Mixing tank #B HCSD Pump House Charge Pump #A HCSD Pump House Charge Pump #B Ash Water Pond H.V. Water Pump #A Ash Water Pond H.V. Water Pump #B Ash Water Pond H.V. Water Pump #C Auxilary Bus bar for SILO PCC #B 90 Kw 90 Kw 75 Kw 75 Kw 75 Kw 75 Kw 75 Kw 766Kw

415V SILO PCC#B(2000 KVA, 6.6 KV +/- 2*2.5 %/0.433 KV) 1 2 3 4 5 6 7 8 9 10 Power Supply for SILO MCC #B Power Supply for HCSD MCC #B HCSD Pump House Area Mixing tank #C HCSD Pump House Area Mixing tank #D HCSD Pump House Charge Pump #C HCSD Pump House Charge Pump #D Ash Water Pond H.V. Water Pump #D Ash Water Pond H.V. Water Pump #E Ash Water Pond H.V. Water Pump #F Auxilary Bus bar for SILO PCC #A 90 Kw 90 Kw 75 Kw 75 Kw 75 Kw 75 Kw 75 Kw 767Kw

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

415V WATER SUPPLY PCC 415V WATER SUPPLY PCC#A(2500 KVA, 6.6 KV +/- 2*2.5 %/0.433 KV) Power Supply for Oil Pump House MCC #A Power Supply for Waste Water MCC #A Electric Motor Driven Hydrant Pump #A Electric Motor Driven Hydrant Pump #B power Supply for Auxiliary Boiler Comprehensive Water Pump House Industrial Water Pump #A Comprehensive Water Pump House Air Preheater Washing Water Pump #A Comprehensive Water Pump House C.W. Compliment Water Pump #A Power Supply for Comprehensive Water Pump House MCC #A Comprehensive Water Pump House C.W. Compliment Water Pump #B Auxiliary Boiler Forced Draft Fan #A Raw Water Pump house Maintenance Box Water Supply Switch gear room Air Conditioner #A Water Supply Switch gear room Air Conditioner #B Raw Water Pump House Lighting Box 185 Kw 132 Kw 11 Kw 11 Kw 198 Kw 198 Kw 110 Kw 110 Kw 185 Kw

415V WATER SUPPLY PCC#A(2500 KVA, 6.6 KV +/- 2*2.5 %/0.433 KV) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Raw Water Pretreatment Plant Dosing Room Axial Fan #A Raw Water Pretreatment Plant Dosing Room Axial Fan #B Raw Water Pretreatment Plant Dosing Room Axial Fan #C Raw Water Pretreatment Plant Filter Room Axial Fan #A Raw Water Pretreatment Plant Filter Room Axial Fan #B Raw Water Pretreatment Plant Disinfect Room Axial Fan Raw Water Pretreatment Plant Switch Board Air Conditioner #A Auxillary Boiler Axial fan #A Auxillary Boiler Axial fan #B Auxillary Boiler Switchgear room Air Conditioner #A Raw Water Pump House Trash- Removal Machine #A Raw Water Pump House Trash- Removal Machine #B Raw Water Pump House Electric Hoist Raw Water Pump House Sewage Pump #A 0.75 Kw 0.75 Kw 0.75 Kw 0.75 Kw 0.75 Kw 0.12 Kw 8.5 Kw 1.5 Kw 1.5 Kw 2.5 Kw 4.5 Kw 4.5 Kw 4.5 Kw 2.2 Kw

415V WATER SUPPLY PCC#B(2500 KVA, 6.6 KV +/- 2*2.5 %/0.433 KV) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Power Supply for Oil Pump House MCC #B Power Supply for Waste Water MCC #B Electric Motor Driven Hydrant Pump #C power Supply for Raw Water Pre-Treatment Plant Electric Motor Driven Spray Pump Comprehensive Water Pump House Industrial Water Pump #B Comprehensive Water Pump House Air Preheater Washing Water Pump #B Comprehensive Water Pump House C.W. Compliment Water Pump #C Power Supply for Comprehensive Water Pump House MCC #B Comprehensive Water Pump House Industrial Water Pump #C Auxillary Boiler Forced Draft Fan #B Raw Water Pre-Treatment Plant maintenance Box Raw Water Pre-Treatment Plant Lighting Box Raw Water Pre-Treatment Plant Sludge Dewatering Room Axial Fan #A Raw Water Pre-Treatment Plant Sludge Dewatering Room Axial Fan #B 0.37 Kw 0.37 Kw 110 Kw 132 Kw 198 Kw 110 Kw 110 Kw 185 Kw 198 Kw

415V WATER SUPPLY PCC#B(2500 KVA, 6.6 KV +/- 2*2.5 %/0.433 KV) 16 Raw Water Pre-Treatment Plant Sludge Dewatering Room Axial Fan #C 17 Raw Water Pre-Treatment Plant Sludge Dewatering Room Axial Fan #D 18 Raw Water Pretreatment Plant Switch Board Room Axial Fan 19 Auxillary Boiler Axial fan #C 20 Auxiliary Boiler Axial fan #D 21 Raw Water Pretreatment Plant Switch Board Room Air Conditiner #B 22 Raw Water Pretreatment Plant Switchgear room Air Conditioner #B 23 Raw Water Pump House Trash- Removal Machine #C 24 Raw Water Pump House Trash- Removal Machine #D 25 Raw Water Pump House Sewage Pump #B 26 Raw Water Pump House Axial Fan #A 27 Raw Water Pump House Axial Fan #B 28 Raw Water Pump House Axial Fan #C 29 Raw Water Pump House Axial Fan #D 0.75 Kw 0.75 Kw 0.75 Kw 1.5 Kw 1.5 Kw 8.5 Kw 2.5 Kw 4.5 Kw 4.5 Kw 2.2 Kw 0.75 Kw 0.75 Kw 0.75 Kw 0.75 Kw

415 V Chemical system PCC 415 V Chemical system PCC#A(1600 KVA, 6.6 KV +/- 2*2.5 %/0.433 KV) 1 2 3 4 5 6 Chemical water blow down water treatment MCC#A DM Plant MCC#A Chemical Laboratory building MCC#A Industrial waste water treatment MCC#A power supply for office building DB Chemical cleaning equipment 286Kw 206Kw 48Kw 105Kw 138Kw

415 V Chemical system PCC#B(1600 KVA, 6.6 KV +/-2* 2.5 %/0.433 KV) 1 2 3 4 5 Circulating water blowdown water treatment MCC#B DM Plant MCC#B Chemical Laboratory building MCC#B Industrial waste water treatment MCC#B power supply for office building DB 306Kw 252Kw 45Kw 147Kw 138Kw

415 V Rain water PCC 415 V Rain water PCC #A(1600 KVA, 6.6 KV +/- 2*2.5 %/0.433 KV) 1 2 3 4 5 6 7 8 9 10 No.1 Transfer Tower MCC#A Conveyor#1A Rain Discharge Big pump#A Rain Discharge Big pump#B Rain Discharge small Pump#A Rain Discharge small Pump#B Rain water pump house maintenance box Rain water Pump house sewage pump#A RW PH crane RW PH light box 2.2 Kw 4.5 Kw 481Kw 160 Kw 160 Kw 160 Kw 110 Kw 110 Kw

415 V Rain water PCC #B(1600 KVA, 6.6 KV +/- 2*2.5 %/0.433 KV) 1 2 3 4 5 6 7 8 9 10 11 12 13 No.1 Transfer Tower MCC#B Conveyor#1B Rain Discharge Big pump#C Rain Discharge Big pump#B Rain Discharge small Pump#C Rain Discharge small Pump#D Rain water pump house maintainance box Rain water pump house switch gear room Axial fan RW PH Axial fan#A RW PH Axial fan#B RW PH Axial fan#C RW PH Switch gear room Air conditioner Rain water Pump house sewage pump#B 0.25 Kw 0.37 Kw 0.37 Kw 0.37 Kw 12.5 Kw 2.2 Kw 160 Kw 160 Kw 160 Kw 110 Kw 110 Kw

415 V Maintenance PCC in MPB(LOC: 6.3 M TG building) PCC#A (630KVA dry type transformer 6.6 KV/0.433 KV) 1 2 3 4 5 CPP MCC#A Turbine Maintenance MCC#A Boiler Maintenance MCC#A Turbine Maintenance MCC#B Boiler Maintenance MCC#B 152kw 53kw 231Kw 53Kw 171Kw

415 V Common Section in MPB(LOC: 6.3 M TG building) 1 2 3 4 5 6 1 2 3 4 5 6 7 8 9 PCC#A (800KVA dry type transformer 6.6 KV+/- 2*2.5 %//0.433 KV) CPP MCC#A Bunker Bay MCC#A Conveyor Belt #10 185 Kw Turbine room Bridge Crane 115.6 Kw Power for lighting & maintenance of switch cabinet#A 20 Kw Switch Cabinet Power#A 10 Kw PCC#B (800KVA dry type transformer 6.6 KV+/- 2*2.5 %//0.433 KV) CPP#B Network Control Building MCC#A Power for lighting & maintenance of switch cabinet#B 20 Kw Conveyor Belt #10 185 Kw Electric Hot Water Tank#A 40 Kw Electric Hot Water Tank#B 40 Kw Electric Hot Water Tank#C 40 Kw Electric Hot Water Tank#D 40 Kw Switch Cabinet Power#A 10 Kw

DESCRIPTION OF 415V PCC LOADS


S.L. NO. 1 2 3 4 5 6 7 8 9 10 11 Description 415V UNIT Aux.Section in MPB 415V Common Section in MPB 415V Maintainance PCC in MPB Lighting PCC 415V Rain water PCC 415V Chemical system PCC 415V IDCT AREA AREA PCC 415V Coal Handling Plant PCC 415V SILO PCC 415V WATER SUPPLY PCC 415V ESP PCC Location 6.3 M TG building 6.3 M TG building 6.3 M TG building 6.3 M TG building Rain Water SWGR Room DM PLANT IDCT Area SWGR Room CHP SWGR Room ASH SILO SWGR House WATER SUPPLY SWGR Room ESP SWGR Room UNIT 1&2

DESCRIPTION OF 415V MCC LOADS


S.NO 1 2 3 4 5 6 7 8 415V SECTION Main Power Building ESP System Section IDCT Area Section Coal Handling System Section Silo Section Chemical System Section Water Supply System Section Rain Water Section Total No. Of MCC 14 2 6 11 2 8 6 2 Total Load(in KW) 2540.52 372 264.6 1833.3 1531.98 1591.41 618.75 942.78

LT SWITCHGEAR

TECHNICAL REQUIREMENTS

The LT Switchgears and AC Distribution board (ACDB) shall be used to provide power, control, indication and protection for the 415V drives/feeders . 415 V LT Switchgear shall have a design fault withstand rating of not less than 50 kA for 1 sec. The switchgear shall be provided with air circuit breakers for rating 1600 A 415 switchboard shall have One (1) No .1000A ACB complete with CTs , PTs ,& protective relay.

AC/DC Power supply for Control and Services

The following auxiliary power supplies shall be made available to each Switchgear A.C. supply : 415 V 10%, 3 Phase, 4 Wire, Single feeder D.C. Supply : 220 V, double feeder

COMPONENTS OF LT SWITCH GEAR

Air Circuit Breakers Instruments Transformer Switches Fuses Contactors Thermal Overload Relay

AIR CIRCUIT BREAKERS


Circuit breaker shall be three pole, single throw, air break type. Circuit breakers shall be draw out type, having SERVICE, TEST & ISOLATED positions with indication for each position. Each breaker shall be provided with an emergency manual trip, mechanical ON-OFF indicator mechanism, charge/discharge indicator. Mechanical safety interlock shall be provided to prevent the circuit breaker from being racked in or out of the service position when the breaker is closed.

INSTRUMENTS TRANSFORMERS
The Current and voltage transformers shall be cast resin insulated types, with primary and secondary terminals marked indelibly. The CTs shall be capable of withstanding the peak momentary short circuit and the symmetrical short circuit current. The neutral side of the CT shall normally be earthed through a link. CT secondary shall be rated for 1 A. Voltage Transformers shall have fuses on both primary and secondary. Secondary of voltage transformer shall be rated for 110 V AC.

SWITCHES
The switches shall be TP/TPN heavy duty, air break mechanism operated by a suitable external handle with position indicator.

FUSES
The fuses shall be of HRC link type . Visual indication shall be provided to indicate fuse failure. The motor fuse rating and characteristics shall be suitably chosen so that they do not operate during the starting period of the motor.

CONTACTORS
The main motor contactors shall be Direct-On-Line (DOL), air break triple pole AC3 duty for AC motors, with minimum 2 NC and 2 NO auxiliary contacts.

THERMAL OVERLOAD RELAY


These shall be three element, ambient temperature compensated, time lagged, bimetal thermal overload relays. Each overload relay shall be provided with a built-in single phasing preventer. The relays shall be flush mounted on the front of the individual draw out module units. Indicating devices shall be so located that it can be seen when the relay has operated, without opening the door. The power supply for the protection relays shall be supplied from the 220 V DC system .

PROTECTIONS
The Minimum protections to be provided for Incomer/outgoing / motor feeder are

MEASURING INSTRUMENTS

All measuring instruments shall be moving iron , spring controlled industrial type and shall have the accuracy class of 1.0 on full scale .

Each incomer/outgoing feeder shall be provided with ammeter with selector switches, voltmeter with selector switches & Multifunctional meters which measures & stores kW , kWh, kVAR, kVARH in addition to other parameters ( i.e. I, V , pf etc) .

INDICATING LAMPS

Indicating lamps shall be LED type. Low wattage, filament type indicating lamps are also acceptable. Lamps shall be provided with the lamp assembly complete, bulb, holder and suitably coloured lens and a nameplate showing its function. Filament type lamp shall be provided with series resistor . Provision for connecting remote indicating lamps shall also be provided in the panel .

OTHER AUXILIARIES

All panels shall be provided with space heaters with thermostat and switch suitable for operating at 240V, 1 phase 50 Hz . Cubicle lamp with door switch suitable for operating at 240V, 1 Phase, 50 Hz AC and 5/15 A plug socket with switch and fuse shall also be provided for each panel .

CABLING AND WIRING

Ample space for connection of cables shall be provided such that cable cores are not in contact with any metal part of the switchgear. All internal power connections shall be of copper . The control wiring shall be done with 1100 V grade, PVC insulated, stranded copper conductors of minimum 2.5 mm2 size for CT circuits and 1.5 mm2 for other circuits. Each control cable shall be identified at either side by interlocking type PVC ferrules .

EARTHING CONNECTIONS

All cubicles shall be connected to a Copper earth bus bar running throughout the length of the switchgear. The frames of all circuit breakers shall be grounded through heavy multiple contacts at all times except when primary disconnecting devices shall be separated by a safe distance

SPECIFIED DESIGN DATA

SPECIFIED DESIGN DATA

SPECIFIED DESIGN DATA

You might also like