You are on page 1of 49

(DIGITAL DISTRIBUTED

CONTROLS AND MANAMAGEMENT INFORMATION SYSTEMS) IN POWER PLANT


24 May 2012 PMI Revision 00 1

SALIENT FEATURES AND MEASURE COMPONENTS OF DDCMIS

24 May 2012

PMI Revision 00

SALIENT FEATURES OF DDCMIS


INTEGRATED PLANT CONTROL FOR SG, TG AND BALANCE OF PLANT CONTROL IT MAY BE REMEMBERED THAT HISTORICALLY THE TERM DDCMIS USED TO BE REFERRED FOR THE SO-CALLED BOPC&I . THE SG-C&I, i.e. FSSS etc. TG-C&I i.e. ATRS, TURBINE PROTECTION etc. ORIGINALLY WERE NOT CONSIDERED UNDER DDCMIS OR DCS AS PER MANY SUPPLIERS. ONLY RECENTLY THE TYPE OF SYSTEMS FOR ALL THE SYSTEMS HAVE BECOME SIMILAR (WITH SOME DIFFERENCE WHICH WILL BE DISCUSSED LATER),.
PMI Revision 00 3

24 May 2012

SALIENT FEATURES OF DDCMIS

INTEGRATED PLANT OPERATION THROUGH FULLY INTERCHANGEABLE OPERTAOR WORK STATIONS (OWS) FOR SG, TG AND BALANCE OF PLANT
(SOMETIMES THIS MAY NOT BE POSSIBLE DUE TO PACKAGING CONCEPT)

24 May 2012

PMI Revision 00

SALIENT FEATURES OF DDCMIS

PROVISION OF EXTENSIVE SELFDIAGNOSTICS USE OF LARGE VIDEO SCREENS FOR PROJECTIONS OF VARIOUS PLANT MIMICS ETC. PROVISION OF FAULT ALARM ANALYSIS TO GUIDE THE OPERATOR TO THE MOST LIKELY EVENT PROVISION OF TREND ALARMS

24 May 2012

PMI Revision 00

SALIENT FEATURES OF DDCMIS


PROVISION OF SAFETY HARDWARE FOR BURNER MANAGEMENT SYSTEMS PROVISION OF FAIL-SAFE HARDWARE FOR TURBINE PROTECTION SYSTEM PROVISION OF ADEQUATE RELIABILITY AND AVAILABILITY WITH PROPER REDUNDANCY IN SENSOR, I/O AND CONTROLLER.

24 May 2012

PMI Revision 00

DDCMIS CONFIGURATION

maxDNA SYSTEM
ENGG. STN FOR HMI HMI MMI LAN HMI REDUNDANT SERVERS ENGG.STN. FOR CONTROL SYS.

PROCONTROL SYSTEM

I.P. BUS Max. 4 nos. rdundant


Redundant F.G.Controllers

Measurement system / I/O subsystem

24 May 2012

PMI Revision 00

MAJOR COMPONENTS OF DDCMIS

24 May 2012

PMI Revision 00

MAJOR COMPONENTS OF DDCMIS


CONTROL SYSTEM MAN-MACHINE INFORMATION AND PLANT INFORMATION SYSTEM (MMIPIS) REDUNDANT DATA COMMUNICATION SYSTEM

(DCS)

24 May 2012

PMI Revision 00

MAJOR COMPONENTS OF DDCMIS


SEQUENCE OF EVENT (SOE ) AND ANNUNCIATION SYSTEM FUNCTIONS SYSTEM PROGRAMMING FACILITY a) TUNING & CONFIGURATION FOR CONTROL SYSTEM b) MODIFICATION & PROGRAM DEVELOPMENT FOR MMIPIS

MASTER & SLAVE CLOCK SYSTEM

24 May 2012

PMI Revision 00

10

CONTROL SYSTEM

24 May 2012

PMI Revision 00

11

CONTROL SYSTEM
PROGRAMMING & CONFIGURATION MMIPIS SYSTEM M&S CLOCK

DCS

SG- C&I SYSTEM


24 May 2012

BOP- C&I SYSTEM


PMI Revision 00

TG- C&I SYSTEM


12

SG-C&I SYSTEM
CONSISTS OF BURNER MANAGEMENT SYSTEM (BMS), SOOT BLOWER CONTROL SYSTEM (SBC), SECONDARY AIR DAMPER CONTROL SYSTEM (SADC), AUXILIARY PRDS CONTROLS (APRDS) FOR BMS, SAFETY SYSTEM HARDWARE IS SPECIFIED, i.e. THE HARDWARE , WHICH MEETS THE REQUIREMENT OF RELEVANT NFPA AND VDE STANDARDS`
24 May 2012 PMI Revision 00 13

SG-C&I SYSTEM
TRIPLE REDUNDANT CONFIGURATION FOR THE FURNACE PROTECTION (MFT) PORTION OF BURNER MANAGEMENT SYSTEM (BMS) FOR SBC, SADC, APRDS,MILL & OIL ELEV. SEQUENCE, INTERLOCK AND PROTECTION, CONFIGURATION SIMILAR TO OLCS/CLCS (DESCRIBED LATER) FOR MILL & OIL ELEV. LOGICS, SAFETY SYSTEM HARDWARE SHALL BE USED

24 May 2012

PMI Revision 00

14

TG-C&I SYSTEM
CONSISTS OF TURBINE PROTECTION SYSTEM (TPS), AUTOMATIC TURBINE RUN-UP SYSTEM (ATRS), AUTOMATIC TURBINE TESTING SYSTEM (ATT), ELECTRO- HYDRAULIC TURBINE CONTROL SYSTEM (EHTC) FOR MAIN & BFP TURBINE, TURBINE STRESS CONTROL SYSTEM (TSCS), GLAND STEAM PRESSURE CONTROL GENERATOR SEAL OIL, PRIMARY WATER & HYDROGEN CONTROL SYSTEM (RECENT ADDITION).
24 May 2012 PMI Revision 00 15

TG-C&I SYSTEM
TRIPLE REDUNDANT OR 2 X 100 % REPEATED TWICE CONFIGURATION FOR THE TURBINE PROTECTION SYSTEM (TPS). FOR THIS, SAFETY SYSTEM HARDWARE / FAIL-SAFE HARDWARE SHALL BE USED FOR OTHERS, CONFIGURATION SIMILAR TO OLCS/CLCS (DESCRIBED LATER) TO BE USED

24 May 2012

PMI Revision 00

16

BOP-C&I SYSTEM
CONSISTS OF OPEN LOOP CONTROL SYSTEM (OLCS) AND CLOSED LOOP CONTROL SYSTEM (CLCS) OLCS -THE SEQUENCE CONTROL, INTERLOCK OF OF ALL THE PLANT SYSTEMS WHICH ARE NOT COVERED IN THE SG-C&I AND TG-C&I. THIS INCLUDES MAJOR AUXILIARIES LIKE FD/ID/PA FANS, AIR-PREHEATER, BFP/CEP/CWP/ BCWP , DMCWP/CLCWP AND ELECTRICAL BREAKERS.

24 May 2012

PMI Revision 00

17

BOP-C&I SYSTEM
(CLCS) -THE MODULATING CONTROL FOR VARIOUS IMPORTANT PLANT PARAMETERS, LIKE FW FLOW (DRUM LEVEL), FURNACE DRAFT, COMBUSTION CONTROL (FUEL FLOW AND AIR FLOW), PA HDR PRESSURE CONTROL, DEAERATOR/HOTWELL/HEATER LEVEL CONTROLS ETC.

24 May 2012

PMI Revision 00

18

MMIPIS

24 May 2012

PMI Revision 00

19

MAN-MACHINE INTERFACE AND PLANT INFORMATION SYSTEM


LATEST STATE-OF-THE-ART WORKSTATIONS /PCs AND SERVERS BASED ON OPEN-ARCHITECTURE AND INDUSTRY STANDARD HARDWARE AND SOFTWARE TO ENSURE BETTER CONNECTIVITY. e.g. HARDWARE FROM COMPAQ/DIGITAL, HP, SUN MICRO-SYSTEM OR OTHER MAJOR SUPPLIERS (LESS DEPENDENCE ON THE C&I SYSTEM SUPPLIER IN THE LONG RUN) OPERATING SYSTEM WINDOWS-2000, OPEN-VMS OR UNIX.
24 May 2012 PMI Revision 00 20

MAN-MACHINE INTERFACE AND PLANT INFORMATION SYSTEM


64/ 32-BIT SERVER/OWS WITH HIGH-SPEED AND LARGE MEMORY (256/512 MB RAM, 8 GB HDD FOR SERVER AND 128/256 MB RAM AND 4/6 GB HDD FOR OWS) TO ENSURE FAST RESPONSE PROVISION OF LVS CONNECTION TO OTHER SYSTEM THROUGH STATIONWIDE WAN

24 May 2012

PMI Revision 00

21

MMIPIS FUNCTIONALITIES
VPC OPERATION OTHER OPERATOR INFORMATIONS THROUGH VARIOUS DISPLAYS ALARMS, LOGS, HISTORICAL AND LONG TERM STORAGE. PERFORMANCE AND OTHER CALCULATIONS

24 May 2012

PMI Revision 00

22

24 May 2012

PMI Revision 00

23

24 May 2012

PMI Revision 00

24

24 May 2012

PMI Revision 00

25

24 May 2012

PMI Revision 00

26

24 May 2012

PMI Revision 00

27

24 May 2012

PMI Revision 00

28

24 May 2012

PMI Revision 00

29

24 May 2012

PMI Revision 00

30

24 May 2012

PMI Revision 00

31

OPC Solves the Problem


Display Application OPC Trend Application OPC Report Application OPC

OPC Software Driver

OPC Software Driver

OPC Software Driver

OPC Software Driver

24 May 2012

PMI Revision 00

32

SOE

24 May 2012

PMI Revision 00

33

SEQUENCE OF EVENT (SOE ) AND ANNUNCIATION SYSTEM FUNCTIONS

ORIGINALLY THESE USED TO BE STAND-ALONE SYSTEM (DIODE AUCTIONEERING, DBTC ETC REQUIRED) NOW INTEGRATED -THEREFORE THE DIODE AUCTIONEERING, DBTC ETC NOT REQUIRED SOE - 1mS RESOLUTION, STORAGE OF REPOTRS FOR LONG DURATION ANNUNCIATION LOGIC THROUGH OLCS/CLCS CONTROLLERS.
24 May 2012 PMI Revision 00 34

SYSTEM PROGRAMMING FACILITY

24 May 2012

PMI Revision 00

35

SYSTEM PROGRAMMING FACILITY

LATEST TREND - COMBINED CONTROL


SYSTEM TUNING & MMIPIS PROGRAMMING SELF-DOCUMENTATION ENGINEERING WORKSTATIONS

24 May 2012

PMI Revision 00

36

Object-Oriented Configuration Graphical object-oriented configuration software tool Includes self-documentation of configuration True object-oriented features including encapsulation and inheritance Library of standard algorithms or objects
24 May 2012 PMI Revision 00 37

MASTER & SLAVE CLOCK SYSTEM

24 May 2012

PMI Revision 00

38

MASTER & SLAVE CLOCK SYSTEM

RECEIVES TIME SYNCHRONISATION SIGNALS EITHER FROM THE GEOPOSITIONARY SATELITE (NPL SIGNAL) DISTRIBUTES THIS SIGNAL TO THE MMIPIS AND THE CONTROL SYSTEM.

24 May 2012

PMI Revision 00

39

OTHER RELATED TOPICS

24 May 2012

PMI Revision 00

40

OTHER RELATED TOPICS POWER SUPPLY SYSTEM


CABLING & TERMINATION OTHER

SG/TG C&I SYSTEM/ EQUIPMENT


PACKAGING CONCEPTS- SCOPE OF SUPPLY OF C&I SYSTEM/PACKAGE

24 May 2012

PMI Revision 00

41

OTHER RELATED TOPICS

OPERATION PHILOSOPHY , CONTROL AREA AND BACK-UP INSTRUMENTATION & GEOGRAPHICAL DISTRIBUTION - COMBINED CYCLE PLANTS REDUNDANCY DESIGN CRITERIA
24 May 2012 PMI Revision 00 42

POWER SUPPLY SYSTEM

CONTROL SYSTEM POWER SUPPLY TWO SETS OF DC POWER SUPPLIES - ONE SET FOR SG/TG-C&I AND OTHER FOR BOP-C&I EACH WITH 2 X 100 % CHARGER AND 2 X 100 % BATTERY. OTHER IMPORTANT AC LOADS LIKE MMIPIS, PANEL INSTRUMENTS, ANALYSERS ETC. SHALL BE POWERED FROM UPS COMPRISING OF 2 X 100 % CHARGER, 2 X 100 % INVERTER AND 1 X 100 % BATTERY. HEAVY DUTY Ni-Cd BATTERIES HAVE BEEN ENVISAGED FOR LONGER LIFE & LESSER MAINTENANCE

24 May 2012

PMI Revision 00

43

CABLING & TERMINATION

EXTENSIVE GROUPING OF SIGNALS BY LARGE SCALE USE OF JBs AT STRATEGIC LOCATIONS


USE OF CABLES WITH HIGHER NO OF PAIRS USE OF CAGE-CLAMP CONNECTION FOR SYSTEM CABINETS, MARSHALLING PANELS & OUTGOING SIDE OF JBs, CJS BOXES etc. USE OF PLUG-IN SOCKET AND CONNECTORS FOR TRANSMITTERS, SWITCHES, LS/TS etc.

24 May 2012

PMI Revision 00

44

IMPORTANT SG/TG RELATED C&I SYSTEM

FLAME MONITORING SYSTEM COAL FEEDER C&I ELECTROMATIC SAFETY VALVES FURNACE TEMP PROBES ACCOUSTIC PYROMETER FOR FURNACE TEMP PROFILE BOILER FLAME ANALYSIS SYSTEM COAL BUNKER LEVEL MONITORING SYSTEM ELECTRONIC DRUM/SEPARATOR LEVEL MONITORING SYSTEM TURBINE SUPERVISORY SYSTEM TDBFP TURBINE SUPERVISORY SYSTEM

IN PACKAGED SYSTEM, THESE ARE UNDER SG & TG PACKAGES.

24 May 2012

PMI Revision 00

45

OPERATION PHILOSOPHY
CENTRALISED OPERATION OF MAIN PLANT THROUGH OWS & LVS OFF-SITE PLANTS TO BE CONTROLLED FROM THEIR LOCAL STATIONS WITH STATION-WIDE LAN DATA LINK MINIMUM BACKUP INSTRUMENTATION ( ORIGINALLY CONSERVATIVE, NOW REDUCED. CRITERIA - HANDLING EMERGENCY & SAFE SHUT-DOWN) GEOGRAPHICAL DISTRIBUTION - ALTHOUGH NOT VERY USEFUL FOR POWER PLANTS AS COMPARED TO PROCESS/INDUSTRIES, BEING ADOPTED FOR FEW AREAS WHERE SIGNALS ARE CONCENTRATED (REDUCTION OF CABLING, MUCH LESS ERECTION & COMMISSIONING TIME)

24 May 2012

PMI Revision 00

46

DESIGN CRITERIA
PROVENNESS
SUPPLIERS EXPERIENCE SYSTEM EXPERIENCE PROVENNESS VS OBSOLESCENCE

RELIABILITY AVAILABILITY
HARDWARE QUALITY (PUBLISHED MTBF etc.) CONFIGURATION REDUNDANCY FAULT TOLERANCE

STANDARDISATION AND UNIFORMITY OF H/W


SAME SERIES & FAMILY OF H/W AS FAR AS POSSIBLE DIFFICULTIES BECAUSE OF PACKAGING CONCEPTS & RESPOSIBILITY CENTRE & INTERFACES (EVEN IN TURNKEY PACKAGE)
24 May 2012 PMI Revision 00 47

DESIGN CRITERIA
OPERABILITY
DESIGN CONCEPT - FAIL SAFE ETC. FALSE TRIP VS SAFETY OPERATOR CONVENIENCE DURING NORMAL RUNNING & EMERGENCY MANAGEMENT REPORTING

MAINTAINBILITY
STANDARDISATION (AS INDICATED ABOVE) MODULAR DESIGN AND EXPANDABILITY DIAGNOSTIC, FAULT IDENTIFICATION AND FAULT TOLERANCE GUARD AGAINST OBSOLESCENCE AVAILABILTY OF SPARES

OTHER CRITERIA
UNIT OPERATION PHILOSOPHY MARKET TRENDS AND EVOLUTION OF INFORMATION TECHNOLOGY FEEDBACKS FROM EXISTING SYSTEMS